In NLDC, the power system control centre of Tenaga Nasional Berhad, the use of on-line security assessment is still in the early stages. This paper undertakes a project implementation of a real time security assessment using VSAT and PSS/E. Real time data is obtained via NLDC's Westinghouse system in a format of different platform. The data is then converted to PTI's version 29 power flow data before it is modified to meet VSAT input data needs. The real time power flow data is then solved using PSS/E and saved. The real time data is then channeled to VSAT to conduct N-1, N-2 and Transfer Analysis of the TNB power system at an interval of 10 minute cycle. The evaluated real time scenario results are then extracted and custom made to be viewed by the system operator using Microsoft Excel. The entire security assessment process is accomplished using PSS/E, VSAT, Visual Basic programming, IPLAN and Microsoft Schedule Task.
Keywords
Contingency analysis, Power system stability, Security assessment, Contingency analysis, Early stages, Input datum, Malaysia, Microsoft, Microsoft excels, On-line, Power flows, Power system controls, Power system stability, Power systems, Project implementations, Real times, Security assessment, Security assessments, System operators, Visual basic programmings, Westinghouse
Divisions
fac_eng
Event Title
3rd IASTED Asian Conference on Power and Energy Systems, AsiaPES 2007
Event Location
Phuket, Thailand
Event Dates
2 - 4 April 2007
Event Type
conference
Additional Information
ISBN: 978-088986657-7