A new forecasting model to improve earned value index to achieve an accurate project time and cost estimation

Document Type

Conference Item

Publication Date

1-1-2009

Abstract

This paper presents a new forecasting model to improve Earned Value (EV) method of projects. This method improves earned value management system (EVMS) and forecasting time and cost for projects. These method use established consists of four variables: Scheduled Performance Index (SPI), Cost Performance Index (CPI), Cost Variance (CV), Schedule Variance (SV). The model has been validated by a simulation study using a progress generator a new software. This software was developed in Visual Studio 2008 - Visual Basic NET 2008 and Microsoft Office Project 2007 and it included some basic assumptions and data were generated day by day randomly. The results show a strong relationship between response variable and above four predictors. Therefore, it can be concluded that the model could be used in a wide range of projects for EAC estimation.

Keywords

Earned Value, Performance Management, Time and Cost Forecasting, Schedule Performance Index, Cost Performance Index

Divisions

fsktm

Funders

IACSIT; Singapore Inst Elect

Event Title

International Conference on Information Management and Engineering

Event Location

Kuala Lumpur, MALAYSIA

Event Dates

APR 03-05, 2009

Event Type

conference

Additional Information

Univ Malaya, Fac Comp Sci & Informat Technol, Dept Software Engn, Kuala Lumpur 50603, Malaysia

This document is currently not available here.

Share

COinS