Date of Award

2011

Thesis Type

Masters

Document Type

Dissertation

Divisions

Faculty of Engineering

Department

Department Of Mechanical Engineering (formally known as Department of Engineering Design and Manufacture)

Institution

Universiti Malaya

Abstract

This case study aims to investigate the results of implementing flexible manufacturing system in a fertilizer plant, for reducing waste. The main problems identified during the study are loss of material, low productivity, low machines utilization, low overall equipment effectiveness and high quantity of reworked material. To achieve the goals of the study, engineering tools such as Flexible Manufacturing System (FMS) and Total Productive Maintenance (TPM) are used. PDSA cycle is followed in developing the framework of the study. A team is formed, which consists of 6 executives to execute the flexible manufacturing systems and engineering tools. An effective flexible manufacturing system is integrated into the Group Technology (GT) cell to manage the flow of materials and the moving speed of conveyor belts. Total Productive Maintenance has been performed to identify the types of waste (or losses) and find the means of its reduction. The overall equipment effectiveness (OEE) has been noticed to have improved from 32.44 percent to 69.01 percent. The monthly output is increased from 6628.16 tons to 8731.48 tons. The percentage of loss of material per hour is decreased from 32.76 percent to 12.44 percent. The quantity of reworked material is reduced from 153.12 tons to 77.89 tons. The study has contributed new ideas for problem solving, through system development and used of engineering techniques production. The study has reduced wastes, inventory and problems induced by wastes. Due to time constraint, this study is focused on the key machines only.

Initial

khm

Additional Information

Dissertation (M.A.) – Faculty of Engineering, Universiti Malaya, 2011.

Share

COinS